R16 / MOUNT HOPE / WORKING ASSET LIBRARY

Every useful frame,
properly filed.

One organized home for the controlling floor drawings, spatial studies, eye-level keyframes and motion tests behind the Northline townhouse project.

Photorealistic dollhouse rendering of the R16 townhouse main floor
R16–SRC–01

Controlling study / main floor

Source-linked · 2K reference
23Image assets
04Collections
14POV keyframes
19Motion tests

A production reference.

The point is not to make every image final. It is to keep every useful source, study and approved frame easy to find—and ready for the next clean video edit.

FEATURED COLLECTIONS

Plan A / Plan B

The leading spatial directions remain grouped separately so references never drift between the repeatable base unit and the premium exposed-end option.

A

ISLAND-LED SOCIAL PLAN

The Gathering Line

Base-plan lead
Plan A architectural visualization

A strong central island organizes the kitchen, dining and living sequence into one continuous social room.

Best for
Entertaining
Character
Open / axial
Developer fit
Repeatable base unit
B

ZONED KITCHEN PLAN

The Room Maker

Premium alternate
Plan B architectural visualization

A more defined kitchen wall and dining zone create distinct moments without closing the rear living space.

Best for
Daily rhythm
Character
Zoned / calm
Developer fit
Exposed end unit

SEQUENCE COLLECTIONS

Two indexed
journeys.

Final-audit locks, holds and rebuilds remain visible together so the decision trail is explicit. The continuous movie will start only after every endpoint is structurally locked and physically adjacent to its successor.

A

Plan A journey

0 / 7
  1. Arrival
  2. Entry
  3. Foyer turn / bridge
  4. Kitchen reveal
  5. Kitchen reverse / bridge
  6. Living to glazing / bridge
  7. Mid-stair ascent / bridge
  8. Stair ascent
  9. Featured bedroom
  10. Corridor bath threshold
  11. Internal ensuite
B

Plan B journey

0 / 7
  1. Arrival
  2. Entry
  3. Foyer turn / bridge
  4. Kitchen reveal
  5. Kitchen reverse / bridge
  6. Living to glazing / bridge
  7. Living room
  8. Mid-stair ascent / bridge
  9. Stair ascent
  10. Featured bedroom
  11. Corridor bath threshold
  12. Internal ensuite

PLAN A / STAIRS → BATHROOM / MODEL SHOWDOWN

Six attempts at one believable move.

The same hard brief in every render: begin in the locked stair frame, move through the landing and hall, then arrive at the locked bathroom frame—without cutting through a wall or changing the house.

01 / stair frame02 / landing03 / corridor04 / bathroom frame
CURRENT WINNER

01 / SEEDANCE 2.0 / ROUTE ANCHORS

Best spatial read

Uses the locked start, landing, corridor and end-frame references. It is the clearest full traversal of the actual Plan A route, so this is the lead candidate for the continuous POV master.

8 seconds · 1080pStart + three route anchors + end
BEST REALISM / KIE TEST

02 / KIE GEMINI OMNI / VIDEO-TO-VIDEO

Strongest interior motion

Refined from the correct Seedance route plate with five spatial checkpoints. It follows the house cleanly, but still misses exact pixel-level start and end locks.

8 seconds · 720pRoute plate + five references
RUNNER-UP / ENDPOINTS

03 / CINEMA STUDIO PRO

Strong endpoint lock

Most faithful opening and closing frames, with a more compressed corridor than the winning route-anchor version.

8 secondsPaired endpoints
CLEAN PASS

04 / KLING 3.0 PRO

Clean, less literal

A controlled pass with solid finishes, though it shifts openings and loosens the intended interior route.

8 secondsPaired endpoints
CLEAN VISUALS

05 / CINEMA STUDIO

Clean but abbreviated

Good visual control and endpoint behavior, but it summarizes the hall rather than truly walking through it.

8 secondsPaired endpoints
BASELINE

06 / SEEDANCE 2.0

Too much invention

The initial two-frame pass preserves the concept, but adds clutter and loses the calm spatial logic of the actual home.

8 seconds · 1080pPaired endpoints
REFERENCE-ONLY

07 / GEMINI OMNI FLASH

Loose reference pass

A useful motion reference, but it does not enforce the hard start and end frames needed for a continuous edit.

8 secondsReference conditioning

ARCHIVED MOTION DIAGNOSTICS

Useful failures, clearly marked.

All twelve clips were generated with Kling 3.0 from paired first and end frames at 720p. They remain visible for diagnosis, but none is approved for the continuous POV master.

Audit result: 0 / 12 clips approved · 2 / 23 current stills locked unchanged · no new video generation in this pass.

A12 / LEGACY TEST

PLAN A · CLIP 01

Arrival → entry hall

A restrained sidewalk approach passes through the real front threshold and settles inside the Plan A hall.

Plan A exterior arrival start frame
First frame / A01
Plan A entry hall end frame
End frame / A02
A23 / LEGACY TEST

PLAN A · CLIP 02

Entry hall → kitchen reveal

The camera follows the real corridor beside the stair before turning into Plan A’s island-led social room.

Plan A entry hall start frame
First frame / A02
Plan A kitchen reveal end frame
End frame / A03
A34 / LEGACY TEST

PLAN A · CLIP 03

Kitchen reveal → living room / superseded

Superseded: its living endpoint adds side glazing to Plan A’s party wall. The corrected rear-facing frame is now in the library.

Plan A kitchen reveal start frame
First frame / A03
Plan A living room end frame
End frame / A04
A45 / LEGACY TEST

PLAN A · CLIP 04

Living room → upper landing / rejected

Rejected: one endpoint pair skips the stair base, full flight and landing approach, causing a visible room-to-wall morph.

Plan A living room start frame
First frame / A04
Plan A upper landing end frame
End frame / A05
A56 / LEGACY TEST

PLAN A · CLIP 05

Upper landing → primary suite

A quiet corridor walk passes the laundry and turns through the real bedroom doorway before settling on the primary suite.

Plan A upper landing start frame
First frame / A05
Plan A primary suite end frame
End frame / A06
A67 / LEGACY TEST

PLAN A · CLIP 06

Bedroom → ensuite / invalid route

Rejected: the permit plan enters this ensuite from the upper corridor, so a direct bedroom-to-bath transition is impossible.

Plan A primary suite start frame
First frame / A06
Plan A ensuite end frame
End frame / A07
B12 / LEGACY TEST

PLAN B · CLIP 01

End-unit arrival → entry hall

The approach holds Plan B’s exposed side elevation, selects the correct front door and settles inside its stair hall.

Plan B exterior arrival start frame
First frame / B01
Plan B entry hall end frame
End frame / B02
B23 / LEGACY TEST

PLAN B · CLIP 02

Entry hall → kitchen overlook / rejected

Rejected: the elevated kitchen overlook creates a balcony and floor change that do not exist on the main-floor plan.

Plan B entry hall start frame
First frame / B02
Plan B kitchen overlook end frame
End frame / B03
B34 / LEGACY TEST

PLAN B · CLIP 03

Kitchen overlook → living room / rejected

Rejected with the overlook anchor. The correct kitchen and living sequence remains on one continuous main-floor level.

Plan B kitchen overlook start frame
First frame / B03
Plan B living room end frame
End frame / B04
B45 / LEGACY TEST

PLAN B · CLIP 04

Living room → upper landing / rejected

Rejected: the wall wipe conceals a missing multi-part stair journey and produces an obvious geometry substitution.

Plan B living room start frame
First frame / B04
Plan B upper landing end frame
End frame / B05
B56 / LEGACY TEST

PLAN B · CLIP 05

Upper landing → primary suite

A direct corridor walk chooses the end-unit bedroom doorway and settles on Plan B’s broader window wall.

Plan B upper landing start frame
First frame / B05
Plan B primary suite end frame
End frame / B06
B67 / LEGACY TEST

PLAN B · CLIP 06

Bedroom → ensuite / invalid route

Rejected: the bathroom is internal and corridor-entered; this clip also inherits the old bathroom’s invented window.

Plan B primary suite start frame
First frame / B06
Plan B ensuite end frame
End frame / B07

CURRENT WORKING DIRECTION

Lead with Plan A as the repeatable base unit: its island-led social room reads immediately and its daily circulation is more direct.

Keep Plan B as the premium exposed-end option, where the extra glazing and more defined zones justify the more layered route through the house.

“The library keeps the evidence.
The final edit tells the story.”