R16 / MOUNT HOPE / WORKING ASSET LIBRARY

Every useful frame,
properly filed.

One organized home for the controlling floor drawings, spatial studies, eye-level keyframes and motion tests behind the Northline townhouse project.

Photorealistic dollhouse rendering of the R16 townhouse main floor
R16–SRC–01

Controlling study / main floor

Source-linked · 2K reference
23Image assets
04Collections
14POV keyframes
19Motion tests

A production reference.

The point is not to make every image final. It is to keep every useful source, study and approved frame easy to find—and ready for the next clean video edit.

FEATURED COLLECTIONS

Haj Riyadh / Haj Saad

The leading spatial directions remain grouped separately so references never drift between the repeatable base unit and the premium exposed-end option.

A

ISLAND-LED SOCIAL PLAN

The Gathering Line

Base-plan lead
Haj Riyadh architectural visualization

A strong central island organizes the kitchen, dining and living sequence into one continuous social room.

Best for
Entertaining
Character
Open / axial
Developer fit
Repeatable base unit
B

ZONED KITCHEN PLAN

The Room Maker

Tour ready

A more defined kitchen wall and dining zone create distinct moments without closing the rear living space.

Best for
Daily rhythm
Character
Zoned / calm
Developer fit
Exposed end unit
Open immersive Haj Saad tour

SEQUENCE COLLECTIONS

Two indexed
journeys.

Final-audit locks, holds and rebuilds remain visible together so the decision trail is explicit. The continuous movie will start only after every endpoint is structurally locked and physically adjacent to its successor.

A

Haj Riyadh journey

0 / 7
  1. Arrival
  2. Entry
  3. Foyer turn / bridge
  4. Kitchen reveal
  5. Kitchen reverse / bridge
  6. Living to glazing / bridge
  7. Mid-stair ascent / bridge
  8. Stair ascent
  9. Featured bedroom
  10. Corridor bath threshold
  11. Internal ensuite
B

Haj Saad journey

0 / 7
  1. Arrival
  2. Entry
  3. Foyer turn / bridge
  4. Kitchen reveal
  5. Kitchen reverse / bridge
  6. Living to glazing / bridge
  7. Living room
  8. Mid-stair ascent / bridge
  9. Stair ascent
  10. Featured bedroom
  11. Corridor bath threshold
  12. Internal ensuite

PLAN A / STAIRS → BATHROOM / MODEL SHOWDOWN

Ten attempts at one believable move.

The same hard brief in every render: begin in the locked stair frame, move through the landing and hall, then arrive at the locked bathroom frame—without cutting through a wall or changing the house.

01 / stair frame02 / landing03 / corridor04 / bathroom frame
CURRENT WINNER

01 / SEEDANCE 2.0 / ROUTE ANCHORS

Best spatial read

Uses the locked start, landing, corridor and end-frame references. It is the clearest full traversal of the actual Haj Riyadh route, so this is the lead candidate for the continuous POV master.

8 seconds · 1080pStart + three route anchors + end
BEST REALISM / KIE TEST

02 / KIE GEMINI OMNI / VIDEO-TO-VIDEO

Strongest interior motion

Refined from the correct Seedance route plate with five spatial checkpoints. It follows the house cleanly, but still misses exact pixel-level start and end locks.

8 seconds · 720pRoute plate + five references
A/B QUALITY PICK

03 / KIE GEMINI OMNI / DIRECT 4K

More native detail

Generated directly at 3840×2160 from the same route, references, prompt and seed. It keeps more material variation for only 20 credits more than the upscale path, but took considerably longer.

Open matched 4K detail crop
8 seconds · 4K source / 1080p web252 credits · $1.26
A/B MOTION-PRESERVING

04 / GEMINI 1080P + TOPAZ 2×

Preserves the approved take

Topaz enlarges the exact 1080p motion and preserves its audio almost transparently. The 4K master is clean and sharp, but smoother and more enhancement-like than the direct render.

Open matched 4K detail crop
8 seconds · 4K source / 1080p web232 credits total · $1.16
A/B SOURCE

05 / KIE GEMINI OMNI / 1080P

Draft before enlargement

This is the exact source used by Topaz. Review it to separate the quality of the underlying motion and geometry from the later resolution enhancement.

8 seconds · 1080p168 credits · $0.84
RUNNER-UP / ENDPOINTS

06 / CINEMA STUDIO PRO

Strong endpoint lock

Most faithful opening and closing frames, with a more compressed corridor than the winning route-anchor version.

8 secondsPaired endpoints
CLEAN PASS

07 / KLING 3.0 PRO

Clean, less literal

A controlled pass with solid finishes, though it shifts openings and loosens the intended interior route.

8 secondsPaired endpoints
CLEAN VISUALS

08 / CINEMA STUDIO

Clean but abbreviated

Good visual control and endpoint behavior, but it summarizes the hall rather than truly walking through it.

8 secondsPaired endpoints
BASELINE

09 / SEEDANCE 2.0

Too much invention

The initial two-frame pass preserves the concept, but adds clutter and loses the calm spatial logic of the actual home.

8 seconds · 1080pPaired endpoints
REFERENCE-ONLY

10 / GEMINI OMNI FLASH

Loose reference pass

A useful motion reference, but it does not enforce the hard start and end frames needed for a continuous edit.

8 secondsReference conditioning

ARCHIVED MOTION DIAGNOSTICS

Useful failures, clearly marked.

All twelve clips were generated with Kling 3.0 from paired first and end frames at 720p. They remain visible for diagnosis, but none is approved for the continuous POV master.

Audit result: 0 / 12 clips approved · 2 / 23 current stills locked unchanged · no new video generation in this pass.

A12 / LEGACY TEST

PLAN A · CLIP 01

Arrival → entry hall

A restrained sidewalk approach passes through the real front threshold and settles inside the Haj Riyadh hall.

Haj Riyadh exterior arrival start frame
First frame / A01
Haj Riyadh entry hall end frame
End frame / A02
A23 / LEGACY TEST

PLAN A · CLIP 02

Entry hall → kitchen reveal

The camera follows the real corridor beside the stair before turning into Haj Riyadh’s island-led social room.

Haj Riyadh entry hall start frame
First frame / A02
Haj Riyadh kitchen reveal end frame
End frame / A03
A34 / LEGACY TEST

PLAN A · CLIP 03

Kitchen reveal → living room / superseded

Superseded: its living endpoint adds side glazing to Haj Riyadh’s party wall. The corrected rear-facing frame is now in the library.

Haj Riyadh kitchen reveal start frame
First frame / A03
Haj Riyadh living room end frame
End frame / A04
A45 / LEGACY TEST

PLAN A · CLIP 04

Living room → upper landing / rejected

Rejected: one endpoint pair skips the stair base, full flight and landing approach, causing a visible room-to-wall morph.

Haj Riyadh living room start frame
First frame / A04
Haj Riyadh upper landing end frame
End frame / A05
A56 / LEGACY TEST

PLAN A · CLIP 05

Upper landing → primary suite

A quiet corridor walk passes the laundry and turns through the real bedroom doorway before settling on the primary suite.

Haj Riyadh upper landing start frame
First frame / A05
Haj Riyadh primary suite end frame
End frame / A06
A67 / LEGACY TEST

PLAN A · CLIP 06

Bedroom → ensuite / invalid route

Rejected: the permit plan enters this ensuite from the upper corridor, so a direct bedroom-to-bath transition is impossible.

Haj Riyadh primary suite start frame
First frame / A06
Haj Riyadh ensuite end frame
End frame / A07
B12 / LEGACY TEST

PLAN B · CLIP 01

End-unit arrival → entry hall

The approach holds Haj Saad’s exposed side elevation, selects the correct front door and settles inside its stair hall.

Haj Saad exterior arrival start frame
First frame / B01
Haj Saad entry hall end frame
End frame / B02
B23 / LEGACY TEST

PLAN B · CLIP 02

Entry hall → kitchen overlook / rejected

Rejected: the elevated kitchen overlook creates a balcony and floor change that do not exist on the main-floor plan.

Haj Saad entry hall start frame
First frame / B02
Haj Saad kitchen overlook end frame
End frame / B03
B34 / LEGACY TEST

PLAN B · CLIP 03

Kitchen overlook → living room / rejected

Rejected with the overlook anchor. The correct kitchen and living sequence remains on one continuous main-floor level.

Haj Saad kitchen overlook start frame
First frame / B03
Haj Saad living room end frame
End frame / B04
B45 / LEGACY TEST

PLAN B · CLIP 04

Living room → upper landing / rejected

Rejected: the wall wipe conceals a missing multi-part stair journey and produces an obvious geometry substitution.

Haj Saad living room start frame
First frame / B04
Haj Saad upper landing end frame
End frame / B05
B56 / LEGACY TEST

PLAN B · CLIP 05

Upper landing → primary suite

A direct corridor walk chooses the end-unit bedroom doorway and settles on Haj Saad’s broader window wall.

Haj Saad upper landing start frame
First frame / B05
Haj Saad primary suite end frame
End frame / B06
B67 / LEGACY TEST

PLAN B · CLIP 06

Bedroom → ensuite / invalid route

Rejected: the bathroom is internal and corridor-entered; this clip also inherits the old bathroom’s invented window.

Haj Saad primary suite start frame
First frame / B06
Haj Saad ensuite end frame
End frame / B07

CURRENT WORKING DIRECTION

Lead with Haj Riyadh as the repeatable base unit: its island-led social room reads immediately and its daily circulation is more direct.

Keep Haj Saad as the premium exposed-end option, where the extra glazing and more defined zones justify the more layered route through the house.

“The library keeps the evidence.
The final edit tells the story.”